Aluminum Boiler Scaffold Part No.166
Aluminum Boiler Scaffold Part No.166. Weight: 30kg.
Industrial Access Equipment
Aluminum Boiler Scaffold Part No.167. Weight: 33kg.
Get pricing & availability
Expert help choosing the right configuration.
Spec guidance • Industrial use cases
Type
Scaffold Components & Accessories
Capacity
Request capacity guidance
Category
Scaffolding
Key Feature
Fast quote turnaround
Only 1/3 of its equivalent steel scaffolding weight and less tan 1/5 of time of erecting, IML makes simple, safe and much faster scaffolding on tanks and boilers.
Benefits: ONLY TWO PEOPLE NECESSARY TO JOIN IT VERY LIGHT FAST AND EASY TO SET UP FEW TOOLS NEEDED DESCRIPTION: Guardrail module DIMENSIONS: 1,83m WEIGHT: 33kg
For Aluminum Boiler Scaffold Part No.167, the catalog lists Weight: 33kg. Match these details to the configuration being quoted; options and model variants may differ.
Readable, scan-friendly specs for fit and capacity.
| Category | Scaffold Components & Accessories |
|---|---|
| Weight | 33kg |
Tell us your requirements and we’ll recommend the best-fit configuration and provide pricing.
More options from the same category and similar equipment.
Aluminum Boiler Scaffold Part No.166. Weight: 30kg.
Aluminum Boiler Scaffold Part No.190. Weight: 35kg.
Aluminum Boiler Scaffold Part No.191. Weight: 35,5kg.
Aluminum Boiler Scaffold Part No.193. Weight: 38kg.
Category-first browsing helps you compare specs fast.
Browse related equipment and request a quote when you’re ready.
Send your requirements — we’ll follow up quickly with options and lead time.
The catalog lists Weight: 33kg. Review the specification and feature sections, then confirm the selected configuration before ordering.
For Aluminum Boiler Scaffold Part No.167, check required working position and equipment reach; combined operator, tool and material load; floor or ground conditions, access width and overhead obstructions. Confirm suitability for your specific task with the equipment documentation.
Use Request a Quote on this page and reference Aluminum Boiler Scaffold Part No.167. Include quantity, intended use, required configuration, delivery address and needed-by date. Pricing, availability and delivery are confirmed in the quote.
Aluminum Boiler Scaffold Part No.167
No obligation • Specialists